Projects - Moana Pool Gymnasium Extension
Moana Pool Gymnasium Extension
- Public were able to use the existing pool during the extension construction period
- Large extension constructed over existing facilities
This contract consisted of a large extension constructed over the top of the existing entry foyer and changing rooms and extended the length of the existing building.
The ambitious design coupled with the difficulties associated with continuance of use of the existing pool presented many challenges, however a commendable effort by the project team ensured the successful completion of the project while minimising the adverse affects caused by the construction on the operation of the pool.
Want to know more about this project? Feel free to contact:
- Mark Garden 03 477 5214
- Dave McKenzie 03 477 4000
Project Details
Image
Client
Contract Value
$2.053M
Contract Period
8.5 Months
Architect
Structural Engineers
Services Engineers
Pedersen Read Electrical Engineers,MSS Service Engineers
Quantity Surveyor
Year of Completion
Project Location