Projects - Moana Pool Gymnasium Extension

Moana Pool Gymnasium Extension

  • Public were able to use the existing pool during the extension construction period
  • Large extension constructed over existing facilities

This contract consisted of a large extension constructed over the top of the existing entry foyer and changing rooms and extended the length of the existing building.

The ambitious design coupled with the difficulties associated with continuance of use of the existing pool presented many challenges, however a commendable effort by the project team ensured the successful completion of the project while minimising the adverse affects caused by the construction on the operation of the pool.

Want to know more about this project? Feel free to contact:

Project Details

Contract Value
$2.053M
Contract Period
8.5 Months
Year of Completion
Project Location