Projects - Hunter Centre, University of Otago, Dunedin
Hunter Centre, University of Otago, Dunedin
- Green Star Level 5 Building
- Reused two existing buildings
- Fast tracked at only 48 weeks
This project was a fast track project that brought us on board shortly after the consultants.
The construction site was on a very compact site located in the middle of Uni / Hospital precinct. The project required Green Star Level 5 including re-use of two existing buildings as well as linking the two together.
This included differing floor heights of the 2 existing buildings, the buildings being out of square and the key desire to produce a final result that looked like a singular new building.
Want to know more about this project? Feel free to contact:
Barry McKay, University of Otago
Simon Parker, Parker Warbuton TA
Brett Raudon, Flanders Marlow
Project Details
Image
Client
Contract Value
$8M
Contract Period
48 Weeks
Project Managers
Architect
Structural Engineers
Duffill Watts
Year of Completion
Project Location