Projects - Hunter Centre, University of Otago, Dunedin

Hunter Centre, University of Otago, Dunedin

  • Green Star Level 5 Building
  • Reused two existing buildings
  • Fast tracked at only 48 weeks

This project was a fast track project that brought us on board shortly after the consultants.  

The construction site was on a very compact site located in the middle of Uni / Hospital precinct. The project required Green Star Level 5 including re-use of two existing buildings as well as linking the two together.  

This included differing floor heights of the 2 existing buildings, the buildings being out of square and the key desire to produce a final result that looked like a singular new building.  

Want to know more about this project? Feel free to contact:

Barry McKay, University of Otago 

Simon Parker, Parker Warbuton TA

Brett Raudon, Flanders Marlow

Project Details

Contract Value
$8M
Contract Period
48 Weeks
Year of Completion
Project Location